Engineering that solved real problems.

Read about the design challenges, execution approaches and audit outcomes across our selected handovers.

Meridian Pharma: Cutting Commissioning Time by 34% on an OSD Cleanroom
Pharmaceutical
Pharmaceutical|2024|Pithampur, Madhya Pradesh

Meridian Pharma: Cutting Commissioning Time by 34% on an OSD Cleanroom

Meridian was scaling its oral solid dosage line and needed a WHO-GMP compliant Class 100,000 cleanroom operational before its export order window closed. Legacy contractors had quoted 14 months, which meant losing a $2.4M shipment.

Schedule saved
5 months
Deviation observations
0
Fan energy saved
8%
Cleanroom class
ISO 8
Sanjeevani Hospital: Four Modular OTs Live in a Single Weekend Cutover
Healthcare
Healthcare|2024|Indore, Madhya Pradesh

Sanjeevani Hospital: Four Modular OTs Live in a Single Weekend Cutover

The hospital wanted to convert its old OTs into modular, NABH-ready suites without shutting down surgeries longer than a weekend. Every hour of downtime meant deferred procedures for critical patients.

Downtime
62 hours
OTs delivered
4
Air cleanliness
ISO Class 5
NABH audit result
Pass
Vibha Biotech: A Vaccine Filling Suite Validated Ahead of Schedule
Biotechnology
Biotechnology|2023|Hyderabad, Telangana

Vibha Biotech: A Vaccine Filling Suite Validated Ahead of Schedule

Vibha needed a Grade A over Grade B filling suite validated to EU-GMP for an export contract. The regulator had already scheduled the inspection window, leaving no room for slippage.

Regulatory outcome
Approved
Major observations
0
Ahead of plan
2 months
Grade
A over B
Ashirwad Steel: Retrofitting Comfort AC Across a Live Rolling Mill
Heavy Industry
Heavy Industry|2023|Raipur, Chhattisgarh

Ashirwad Steel: Retrofitting Comfort AC Across a Live Rolling Mill

A 24x7 rolling mill needed climate control for control rooms and offices without interrupting production. Ambient temperatures near hot zones crossed 48°C in summer, hurting operator health.

Production loss
0 hours
Temperature drop
24°C
Absenteeism
-21%
Zones covered
11